excavation face support 掘进工作面支护
effect of excavation face 开挖面效应
pressure of excavation face 掘进面压力
excavation face space effect 开挖面空间效应
fully mechanized excavation face 综掘工作面
stability mechanics of excavation face 开挖面稳定机理
face excavation 断面开挖
face excavation construction 进洞施工
full-face excavation tunnel 全断面开挖隧道
The result indicates that the CRD method is the proper construction method on this condition and gives the proper distance between the second lining and the excavation face.
结果 表明,CRD法是该级围岩条件下的合理工法,同时给出了二次衬砌应滞后掌子面的合理距离。
Stability of excavation face is a key problem to shield tunnel construction technology.
开挖面的稳定性是盾构隧道施工技术的关键。
Temporary supporting is a requisite working procedure for bolting work in full mechanized roadway excavation face.
综掘巷道采用锚杆支护时,临时支护是必不可少的一道工序。
应用推荐